• THE CONTACT
  • THE BLOG
  • THE BIKES
  • THE ABOUT
  • THE PROCESS
Menu

DAVMOMOTO

CUSTOM METAL
  • THE CONTACT
  • THE BLOG
  • THE BIKES
  • THE ABOUT
  • THE PROCESS
A full 22 hours in, and there is still a ways to go on this one. Made from brass sheet and pounded into shape, it takes thousands of hammer strokes to get to this point. This is a side badge for the 1957 Triumph Freebird build for the Bornfree Show …

A full 22 hours in, and there is still a ways to go on this one. Made from brass sheet and pounded into shape, it takes thousands of hammer strokes to get to this point. This is a side badge for the 1957 Triumph Freebird build for the Bornfree Show 11. There is already some brass on the bike, so this will most likely be left un-plated. Probably another day or more to finish this one…and then make another mirror image one.

Making badges for the 1957 Triumph Freebird.

December 17, 2018
.050 brass sheet cut into rough shape allow the basic form to be started using anvils, hammers, and a shot bag. As it takes form, the edges get slowly cut and sanded down, making small adjustments to fit the contour of the tank. The original badges …

.050 brass sheet cut into rough shape allow the basic form to be started using anvils, hammers, and a shot bag. As it takes form, the edges get slowly cut and sanded down, making small adjustments to fit the contour of the tank. The original badges were helpful in the early part of the process,

This is after a couple rounds of beating on the shot bag with a small ball-peen. Between each round of beating, the metal is annealed, or heated to get rid of work-hardness in the metal.

This is after a couple rounds of beating on the shot bag with a small ball-peen. Between each round of beating, the metal is annealed, or heated to get rid of work-hardness in the metal.

At this point the ridges are starting to take shape. Metal mandrels, hammers, and anvils are used up to this point, but the repousse technique will be used to get the fine detail.

At this point the ridges are starting to take shape. Metal mandrels, hammers, and anvils are used up to this point, but the repousse technique will be used to get the fine detail.

A buck was made of wood to fit the contour of the pieces. The back of the piece was filled with pitch and then laid on top.

A buck was made of wood to fit the contour of the pieces. The back of the piece was filled with pitch and then laid on top.

Black German pine resin pitch that softens when heated is used to support the metal so the deep relief areas can be worked out. The ball-ended hammer handle allows it to rotate in the palm for rapid strikes .The small steel tools are traditional rep…

Black German pine resin pitch that softens when heated is used to support the metal so the deep relief areas can be worked out. The ball-ended hammer handle allows it to rotate in the palm for rapid strikes .The small steel tools are traditional repousse and chasing type along with some homemade Shitame repousse type..

After about 30 hours…

After about 30 hours…

Over 40 hours in the piece at this point, but nearing the end.

Over 40 hours in the piece at this point, but nearing the end.

Over fifty hours in the pair at this point. There will be some more detailing on the right badge, mostly texturing the surfaces. Still trying to decide whether to go with a hammered or sanded and polished finish. There is a good chance the dark colo…

Over fifty hours in the pair at this point. There will be some more detailing on the right badge, mostly texturing the surfaces. Still trying to decide whether to go with a hammered or sanded and polished finish. There is a good chance the dark coloring will be used to match a number of other brass part regardless of which surface treatment is used..

At close to 90 hours.

At close to 90 hours.

Still some work to get these finished, but glad to be this far along. Studs will be applied on the backside to attach them to the tank.

Still some work to get these finished, but glad to be this far along. Studs will be applied on the backside to attach them to the tank.

#bf11invitedbuilder # bf11invitedbuilder #bf11 #bornfreeshow

Tags #bf11invitedbuilder, #bf11, #bornfree11, #freebirdbike
← Making the switch panel for the 1957 Triumph FreebirdThe Jack Wilson 1967 triumph t120r bonneville revival. →

WTF is going on here?

Featured
Apr 13, 2025
1979 Honda Z50R Restoration.
Apr 13, 2025
Apr 13, 2025
Dec 1, 2024
Finishing the 1967 Triumph Mountain Cub Restoration
Dec 1, 2024
Dec 1, 2024
Oct 10, 2024
Another 1967 Triumph Mountain Cub in the shop
Oct 10, 2024
Oct 10, 2024
Sep 25, 2024
Back from the Denton Texas Burnouts Custom Motorcycle Show.
Sep 25, 2024
Sep 25, 2024
Aug 28, 2024
1963 Ducati Diana 250 Mark III completion
Aug 28, 2024
Aug 28, 2024
Jun 12, 2024
Finishing the 1974 Honda CT70 Dax "Dino" custom.
Jun 12, 2024
Jun 12, 2024
Feb 14, 2024
Detailing out the 1974 CT70 Dax Custom
Feb 14, 2024
Feb 14, 2024
Dec 31, 2023
Painting the 1974 Honda CT70 Dax. Chapter two.
Dec 31, 2023
Dec 31, 2023
Nov 23, 2023
The 1974 Honda CT70 Dax custom gets painted.
Nov 23, 2023
Nov 23, 2023
Nov 2, 2023
New chrome, powder coat, zinc plate and custom parts for the 1974 CT70 Dax Custom.
Nov 2, 2023
Nov 2, 2023

 

XXXXXXXXX